Physics Problem NEED HELP!!!!!!?

It takes 4.0 uJ of work to move a 11 nC charge from point A to B. It takes -6.5 uJ of work to move the charge from C to B.

What is the potential difference VC - VA?

VC - VA = ___V

Update:

@ D g: Thats not the right answer. my hw problems are online based and its not accepting that answer.

1 Answer

0 votes
by
selected by
 
Best answer

it actually is the answer the units are slightly wrong

11 nC = 11 * 10^-09

and 4.0 uJ = 4.0 *10^-6

W = qV is the point charge work formula

4.0 uJ = 11*10^-9*Va

Va = 4.0*10^-6/11*10^-9volts

Va = 3.6 * 10^2

the other is

-6.5 uJ = 11nC * Vc

Vc = - 6.5*10^-6/11*10^-9 volts

Vc = -5.9*10^2

V = Vc - Va = -5.90*10^2 - 3.6*10^2 = -9.5*10^2

sorry about the unit screw up

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat.